Face Fastened MCM Completes 20 Years of Zero Maintenance Service

We received an invitation to view the Reynobond® Face Fastened System at the AIA show in Miami.  Miller Clapperton wants to congratulate Alcoa on their entry into this market. 

Back in 1990, Miller Clapperton designed, fabricated and installed a Face Fastened MCM Panel System for the 1100 Peachtree Street Building in Atlanta, Georgia.  The panels formed an open equipment screen that became a lighted beacon for this 28-story office building located in Mid Town Atlanta. 

After 20 Years, the panel system has required zero maintenance.  A recent site inspection revealed that both the panels and their exposed fasteners still look great. 

This is a proven system from a Certified Fabricator of Metal Composite Material.  Check out Miller Clapperton at www.millerclapperton.com and our credentials as a Premium Certified Fabricator (Link)

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s


Follow

Get every new post delivered to your Inbox.